Get the right air permit the first time – and stay compliant with it after.
Facilities that emit air pollutants above certain thresholds must obtain the appropriate air permit under the Clean Air Act before construction or operation. Vanguard determines which permit type applies to your facility, prepares and files the application, and manages your ongoing emissions monitoring and reporting obligations.
Who Needs an Air Permit?
You likely need air permit coverage if your facility:
- Operates equipment that emits regulated air pollutants (boilers, generators, paint booths, dryers, process vents, storage tanks, etc.)
- Has actual or potential emissions above your state's minor source or synthetic minor thresholds
- Is a major source under Title V (generally 100+ tons/year of a criteria pollutant, or lower thresholds for hazardous air pollutants)
- Is planning new construction, a facility expansion, or equipment changes that could increase emissions
- Has an existing permit that needs renewal, modification, or a change in operating conditions
Vanguard Service Areas
Vanguard supports air permitting for facilities nationwide, with particular depth in states with active air quality enforcement, including:
- Texas (Dallas/Ft. Worth, Houston) • California (Los Angeles)
- Illinois (Chicagoland) • Arizona (Phoenix)
- Ohio (Cincinnati/Dayton) • Florida (Tampa/St. Petersburg)
- Oklahoma (Tulsa/Oklahoma City)
Frequently Asked Questions
How do I know if my facility needs a minor source permit or a Title V permit?
It depends on your facility's actual and potential emissions of regulated pollutants compared to your state's major source thresholds. Vanguard performs an emissions inventory and applicability review as the first step, at no obligation.
What is a synthetic minor permit, and why would I want one?
A synthetic minor permit allows a facility to accept enforceable emissions limits that keep it below major source thresholds, avoiding the more extensive monitoring, reporting, and renewal requirements of a Title V permit.
How long does it take to get an air permit?
Timelines vary significantly by permit type and state agency, ranging from a few weeks for streamlined minor source permits to a year or more for Title V permits. We provide a facility-specific estimate during the applicability review.
Do I need a new permit if I add equipment or change my process?
Often, yes. Adding emission units or changing operations can trigger a permit modification, and in some cases a new preconstruction permit, depending on the emissions impact.
What happens if I operate without the correct air permit?
Operating without required permit coverage, or outside your permit's conditions, can result in EPA or state enforcement action and significant per-day penalties.
Can Vanguard handle air permitting alongside our other environmental compliance work?
Yes. Many Vanguard clients manage air permitting together with RCRA, SARA, TRI, and stormwater compliance under a single ongoing relationship.
Let Vanguard Handle Your Air Permitting
Don't let the wrong permit type – or a missed modification – turn into an enforcement issue. Call (918) 641-5588 or contact us to schedule an air permitting applicability review.